Structure

 

Chairman: Iony Patriota

iony@tecnix.com.br

Tel: +55 81 34692528



 

Secretary: Rannveig S. J. Løken

rannveig.loken@statnett.no

Tel: +47 900 59 482


 

Advisory Groups

TAG B51 - Strategic Advisory Group
  • Convener: Iony Patriota(BR)
  • Duration: Permanent
TAG B52 - Tutorial
  • Convener: Klaus-Peter Brand
  • Duration: Permanent

 

Working groups- Task Forces

 
WG B5-14 - Wide Area Protection and Control Technologies
  • Convener: Vladimir Terzija
  • Dates: /
WG B5-23 - Short circuit protection of circuits with mixed conductor technologies in transmission networks
  • Convener: Luc Uyttersprot (BE)
  • Dates: /
WG B5-24 - Protection Requirements on Transient Response of Voltage and Current Digital Acquisition Chain
  • Convener: Janez Zakonjsek, (RU)
  • Dates: /
WG B5-27 - Implications and Benefits of Standardised Protection Schemes
  • Convener: Alex Apostolov (US)
  • Dates: /
WG B5-31 - Management of Protection Relay Settings
  • Convener: P. Crossley (UK)
  • Dates: 2006 - 2009
WG B5-36 - Applications for Protection Schemes based on IEC 61850
  • Convener: D. Tholomier (FR)
  • Dates: 2006 - 2008
WG B5-37 - Protection, control and monitoring of Shunt Reactors
  • Convener: Stefan Roxenborg (SE)
  • Dates: 2006 - 200?
JWG B5/B4.25 - Impact of HVDC Stations on Protection of AC Systems
  • Convener: Xi-cai Zhao
  • Dates: /
WG B5.39 - Documentation requirements from design to operation to maintenance for Digital Substation Automation Systems
  • Convener: Rodney Hughes (AU)
  • Dates: /
WG B5.40 - Education, Qualification and Continuing Professional Development of Engineers in Protection and Control
  • Convener: Mladen Kesunovic (US)
  • Dates: /
WG B5.41 - Investigation of possibilities to improve metering systems for billing purposes in substations
  • Convener: Robert Burgers (IE)
  • Dates: /
WG B5.42 - Experience concerning availability and reliability of DSAS
  • Convener: Massimo Petrini (IT)
  • Dates: 2011
WG B5.43 - Coordination of Protection and Automation for Future Networks
  • Convener: Mark Adamiak (US)
  • Dates: 2011-
WG B5.44 - Protection Schemes for Special Transformers
  • Convener: Zoran Gajic (SE)
  • Dates: 2011-
WG B5.45 - Acceptance, Commissioning and Field Testing Techniques for Protection and Automation Systems
  • Convener: Cahuet Eric (FR)
  • Dates: 2011-
JWG D2/B5.30 - Communications for HV Substation Protection & Wide Area Protection Applications
  • Convener: C. Samitier (ES)
  • Dates: /